The Official Olympic Team GB Fan Zone at Kings Cross 2024

For the 2024 Olympics, we delivered the Official Team GB Fan Zone at King’s Cross, supporting a vibrant three-week celebration of live sport and fan engagement. Our team provided consultation and design for the live broadcast big screen experience, including the installation of a 6.5m x 4m outdoor video wall and a bespoke video wall screen gate. We managed all technical and structural elements, supplying full build and de-rig crews, as well as dedicated on-site technicians and structural management throughout the duration of the event to ensure seamless day-to-day operation. Consultation and design for the live broadcast big screen

 

Equipment supplied in detail

  • 1 x DMT P5.9, 6.5m x 4m outdoor video walls and all processing and control
  • 1 x Milos LSG0 6m x 4m Screen Gate
  • 12 Tonnes of water ballast
  • 6m x 3m Gala Shade Pro 50 technical production gazebo
  • All video control and power distribution
  • Technical and structural build and de rig crew
  • Daily structural checks and on-site management staff
  • Daily AV technicians to operate the video walls and custom content

    Contact Us