MCAPS Start for Partners is Microsoft’s annual event to launch the new fiscal year, bringing together hundreds of staff and contractors for a large-scale conference experience. To mark the close of the event, a mini festival was booked, featuring headline performances from Keane and Sophie Ellis-Bextor. We were appointed by the event agency to deliver the full staging and structural package, including a covered roof structure for the main stage and a dedicated covered front-of-house position. In addition, we supplied all stage decking and integrated video wall solutions, creating a fully equipped live performance environment. The result was a seamless transition from conference to festival, delivering a high-energy finale that combined strong technical delivery with an engaging audience experience.


Equipment supplied in detail
- Milos MR1T self-climbing, 10m x 8m arc roof structure with black and silver roof
- 2 x Milos MR0 6m x 4m Sloping roof side structures
- POD Access ramp using GT tour deck, handrails and accessories
- All stage and platforms using GT tour deck, handrails and accessories
- 1 x DMT P5.9, 6.5m x 4m outdoor video walls and all processing and control
- 24 Tonnes of concrete ballast
- All control and power distribution
- Technical and structural build and de rig crew
- Daily structural checks and on-site management staff
- Daily AV technicians to operate the video walls and custom content